Are you OZEV approved installers?

Yes, JME Green Energy is fully OZEV approved. OZEV stands for the Office for Zero Emission Vehicles, a UK government body that sets standards for EV charger installations.

What OZEV approval means:

  • Government-assessed quality — our installation practices, safety standards, and customer service have been assessed and approved by the UK government
  • Grant access — we can process OZEV EV chargepoint grant applications for eligible properties. This includes flats, rental accommodation, and some commercial properties.
  • Compliance — every installation meets or exceeds the safety and quality standards required by current regulations

Why it matters when choosing an installer:

  • Not all electricians are OZEV approved. Choosing an approved installer ensures your installation is safe, compliant, and eligible for any grants.
  • An OZEV-approved installation protects your charger’s manufacturer warranty
  • It provides an additional layer of consumer protection beyond standard electrical regulations

We are also members of the EVCC (Electric Vehicle Consumer Code) and NAPIT approved, giving you multiple layers of quality assurance and consumer protection.

Got more questions?

Call us on 01786 357014 or get a free proposal — no obligation.

Proud Partners with the Industry's Leading Brands

We are officially trained and approved to install equipment from the most trusted names in renewable energy. This is your assurance of a quality installation and a fully-protected warranty.

Tesla Powerwall logo
Give Energy logo
Tesla Energy
Andersen EV logo
SolarEdge logo
Myenergi logo
Pod Point logo
Hypervolt logo
Easee logo
Wallbox logo
Solis logo
Tesla Powerwall logo
Give Energy logo
Tesla Energy
Andersen EV logo
SolarEdge logo
Myenergi logo
Pod Point logo
Hypervolt logo
Easee logo
Wallbox logo
Solis logo