Featured Article
EV Charging
Scotland
Grants
Cross-Pavement
Energy Saving Trust
Transport Scotland
Stop Trailing Cables: The £3,500 Grant for Pavement Charging

Stop Trailing Cables: The £3,500 Grant for Pavement Charging

Up to £3,500 for cross-pavement EV charging in East Lothian, Perth and Kinross, and Renfrewshire. Who qualifies, what it covers, how to apply, timelines, VAT tips.

JME

JME Green Energy

JME Green Energy Team

Updated 6 min read

⚡ Key Takeaways

  • Get up to £3,500 funding for cross-pavement charging channels (gulleys).
  • Available in East Lothian, Perth & Kinross, and Renfrewshire (Pilot).
  • Funding is first-come, first-served – apply before proper budget runs out.

Quick disclaimer: This pilot funding is first-come, first-served and subject to council approval and available budget—apply early and wait for your offer letter before any work starts.

Let’s hope you’re not one to be trailing a charging cable across the pavement.

You’re either not doing it (meaning you’re stuck paying a fortune on public chargers), or you are doing it and just waiting for someone to trip or the council to come knocking.

One of the biggest frustrations for EV owners is not having a driveway while neighbours can use lower-cost home charging and they must rely on more expensive public rapid chargers.

There is good news however, if you live in East Lothian, Perth and Kinross or Renfrewshire, there’s a new pilot grant that can fix this problem, and it’s a big one.

It’s up to £3,500 to get a safe, legal and permanent charging solution installed and running right from your house to the kerb.

What Is It That You Get?

For most people the best solution is a pavement gully. It’s a small channel that’s cut into the pavement, running from your property to the kerb. Your charging cable sits inside this channel, completely flush with the ground, so no trip hazards.

When you’re not using it, a little lid clicks into place. It’s a clean, simple and permanent fix.

Some streets aren’t suitable for a gully, so the council may point you to a pop-up kerbside bollard instead. It sits flush when not in use, then rises when you’re charging. Neater look, usually a bit pricier.

The main point is that it connects to your own home’s electricity. You can use ordinary home charging—currently around 7p per mile on a broad Energy Saving Trust comparison—or schedule within a cheaper EV-tariff window where available.

Quick reality check while we’re here. This only works when you’re parked near your own frontage. You’ll want a cable long enough for the usual parking spots outside your place, but you can’t run it across neighbours’ frontages or leave any slack across the path.

Eligibility At A Glance

You:

  • live in East Lothian, Perth and Kinross, or Renfrewshire
  • have no off-street parking. No driveway, no garage, no private space
  • own, lease, or have an order in for a fully electric vehicle (not a plug-in hybrid)
  • have a home charge point or will be installing one as part of the project
  • have written council approval for a cross-pavement solution at your exact address

The Grant, The Nitty-Gritty

The pilot is run by Transport Scotland and the Energy Saving Trust. Here's a little breakdown for you:

DetailInformation
Grant AmountUp to £3,500 per household.
Who's It For?You must live in East Lothian, Perth and Kinross, or Renfrewshire.
The CatchYou must have no off-street parking. No driveway, no garage, no private space.
What It CoversThe £3,500 is for the cross-pavement works (cutting the gully, installation, etc.)
What It Doesn't CoverOnly up to £400 of the Scottish award can be allocated to the chargepoint itself.

The Scottish award can allocate up to £400 toward the chargepoint itself. A separate OZEV grant for households with on-street parking can cover 75% of eligible chargepoint costs, up to £500. Do not assume that both awards can fund the same cost: confirm the permitted combination with the Energy Saving Trust and OZEV before applying.

Does This Reserve Your Parking Space?

Nope! This grant does not reserve you a parking space. It’s still the public road. You can’t claim it as yours. It just means that when you get parked outside your house, you can safely plug your car into your own supply.

A quick heads-up on planning and permissions. Listed buildings, conservation areas, tenements/flats, adopted pavements or awkward utility layouts might need extra approvals. Nothing scary, just an extra step or two and we’ll flag it early so it doesn’t stall.

How To Apply

This is the important part.

⚠️ Critical: It is critical that you apply and get your official grant offer before any work starts.

If you get an installer (even us) to do the work first, you'll not be reimbursed. I can't stress this enough.

Here’s the 5 Step Plan:

  1. Talk to your council first. Call East Lothian, Perth & Kinross or Renfrewshire council. You need to get their approval in principle for a cross pavement solution at your specific address. Ask about “cross-pavement cable management” and if they have a policy or preferred products. This is non-negotiable.
  2. Get a quote. Once the council has given you the green light, call an approved installer (JME Green Energy are happy to help with this) for a detailed quote. Ask for the cross-pavement work and the charger shown clearly.
  3. Apply to the Energy Saving Trust. You’ll submit your online application, uploading your quote and your council approval. Keep your photos and documents tidy, you’ll need them later.
  4. Wait. You must wait for your official grant offer letter to come via email. Reviews are often around 8 working days, so don’t panic if it’s not instant.
  5. Install. After you have the letter you can call us to book the installation. When it’s done, submit your claim with the invoices and photos. Refunds are typically back in around 15 working days.

The whole process can take around 6-10 weeks, so it’s worth starting the process ASAP.

VAT tip while you're budgeting: A standalone EV charger install is usually 20% VAT. Solar panels and home batteries are 0% VAT until March 2027. If you're bundling work, ask us to itemise VAT on the quote so you know exactly what's what.

A couple of small tips that save hassle later: If you often can't park right outside, a slightly longer cable gives you more wiggle room without leaving slack across the pavement. And take photos before the trench, during, and after, plus screenshots of council approvals. Future you will be grateful when it's claim time.

We Can Handle the Hassle.

Let us handle the hassle for you. We at JME Green Energy aren’t a faceless company, we’re based right here in Scotland. We’re not a bunch of marketers, we’re your straight talking, no jargon installers. We’re the ones that actually turn up to do the work.

We can:

  • Give you the proper detailed quote that you need for the grant.
  • Help you make sense of what the council needs.
  • Install both the pavement gully or a pop-up bollard and your wall charger at the same time.
  • And while we're at it, we can discuss solar panels or a home battery so more of your charging can use your own surplus generation.

This grant is a bit of a hassle, but the payoff is huge. Stop giving your money to public charge point companies.


Frequently Asked Questions

You must live in East Lothian, Perth and Kinross, or Renfrewshire, have no off-street parking (no driveway, garage, or private space), own or lease a fully electric vehicle (not a plug-in hybrid), have or be installing a home charge point, and have written council approval for a cross-pavement solution at your exact address.
The pilot grant currently covers three council areas: East Lothian, Perth and Kinross, and Renfrewshire. This is a pilot scheme, so it may expand to other areas in the future.
The Scottish award can allocate up to £400 of the £3,500 total toward the chargepoint. A separate OZEV on-street parking grant can cover 75% of eligible chargepoint costs up to £500, but you must confirm that the schemes can be combined and cannot claim twice for the same cost.
The whole process typically takes around 6-10 weeks. After submitting your application to the Energy Saving Trust, reviews are often around 8 working days. Once approved and installed, refunds are typically processed within 15 working days after you submit your claim.
Yes, council approval is essential and non-negotiable. You must contact your local council (East Lothian, Perth & Kinross, or Renfrewshire) first to get their approval in principle for a cross-pavement solution at your specific address. You'll need written council approval to include with your grant application.
No, this grant does not reserve you a parking space. The road remains public, and you cannot claim a space as yours. When you can park outside your home, the approved solution lets you charge safely from your own supply instead of relying entirely on public chargers.
The grant works best if you can usually park near your frontage. If you often can't park right outside, consider requesting a slightly longer cable in your quote to give you more flexibility without leaving slack across the pavement. The solution only works when you're parked near your own frontage.
No. It is critical that you apply and get your official grant offer letter before any work starts. If you get an installer to do the work first, you will not be reimbursed. Always wait for your grant offer letter before booking any installation work.
For most people, a pavement gully is the best solution—a small channel cut into the pavement that sits flush with the ground. However, some streets aren't suitable for a gully, so the council may recommend a pop-up kerbside bollard instead, which sits flush when not in use and rises when charging.
Listed buildings, conservation areas, tenements/flats, adopted pavements, or awkward utility layouts might need extra planning and permissions. Your installer should flag these early in the process so they don't cause delays.

Ready to get started?

This grant is a bit of a hassle, but the payoff is huge. Stop giving your money to public charge point companies.

Up to £3,500 for cross-pavement charging solutions
Typical home charging is around 7p per mile on the current broad comparison
Safe, legal, and permanent installation

We can handle the hassle for you. We're not a faceless company—we're based right here in Scotland, and we're the ones that actually turn up to do the work.